Green Valley (Khilkhet) Housing Project-1
Green Valley (Khilkhet) Housing Project-1 is the society's largest active housing project. The project is planned over approximately 314.47856 bighas of land. The society has purchased or exchanged 249.9946 bighas in the project name, of which 235.1542 bighas fall inside the approved layout and have been mutated in the society's name. Development work is progressing across land regularization, internal roads and drains, electricity, water supply, mosque construction, school facilities, lake planning, and boundary/security infrastructure.

At a Glance
| Project Name | Green Valley (Khilkhet) Housing Project |
|---|---|
| Number of Project Members | 2,278 members |
| Mouzas Included in the Project | Talna, Mastul, Dumni, Dhelna, Baothar, Barua |
| Land Included in the Layout | 103.77792 acres or 314.47856 bighas |
| Unexchanged Land Included in the Layout | 22.206855 acres or 67.2935 bighas |
| Land Purchased/Exchanged in the Society’s Name Within the Layout | 77.600886 acres or 235.1542 bighas |
| Description | Number | Allocated Land Area |
|---|---|---|
| Total Residential Plots (10 Kathas) | 285 | 142.51 bighas (47.11 acres) |
| Educational Institutions | 2 | 11.22 bighas (3.71 acres) |
| Medical College and Hospital | 1 | 3.81 bighas (1.26 acres) |
| Mosque | 1 | 1.54 bighas (0.51 acres) |
| Community Center | 1 | 1.66 bighas (0.55 acres) |
Overview
The total land area of the Khilkhet Housing Project is approximately 314.47856 bighas. The society has purchased and mutated 235.1542 bighas in its own name.
The layout includes 9.05469 bighas of khas land, 7.01636 bighas of Union Parishad and Court of Wards land, and 67.2935 bighas that still need exchange or purchase. Early action is needed to exchange and register the remaining land in the society's name.
The project is progressing across several areas, including plot registration, model mosque construction, internal roads and drainage, DESCO electricity infrastructure, water supply planning with Dhaka WASA, school establishment, lake excavation, and a proposed security wall with a July Memorial plaque.
Key Facts
Project Gallery
Milestones
- •Land registration completed for 67 unencumbered plots in two phases during July and August 2025.
- •Base type-1 work on the connecting road from the 300 Feet Road has been completed; carpeting remains pending.
- •The project has been included in the proposed Expanded Dhaka City Water Supply Resilient Project of Dhaka WASA.
- •Model Mosque construction by the Islamic Foundation is in progress on 51.33 decimals, roof casting/slab completion.
- •The Ministry of Primary and Mass Education sent a follow-up letter on 05.02.2025 regarding an aesthetically designed primary school in the project area.
- •Soil tests for the internal lake have been completed after site visits by Water Development Board engineers.
- •In 2025, current committee acquired/exchanged 0.78936 acres / 2.392 bighas
- •In first half of 2026, current committee acquired/exchanged 0.394 acres / 1.1969 bighas
- •Government primary school administrative approval received
- •RFP for 8 prototype residential building designs published on 31.03.2026 RFP pre-bid meeting held on 20.04.2026 RFP submission deadline extended to 21.05.2026
- •11 shares allotted to deprived members under official decisions
Open Items
- •Exchange and register the remaining 67.2935 bighas included in the project layout.
- •Complete carpeting of the connecting road from the 300 Feet Road.
- •Prepare and submit the relevant DPPs for lake, riverbank, canal, and protection works through the proper ministries.
- •Construct the proposed eastern security wall with a July Memorial plaque after estimate finalization.
- •Remaining exchange/purchase land after school adjustment: 67.2935 bighas still needs settlement
- •Total non-purchased land inside approved layout: 79.32436 bighas; requires further purchase/exchange/legal settlement
- •DESCO future work: 306 more electric poles expected
- •RFP for 8 prototype residential building designs for 10, 20, and 40 katha plots needs final selection and implementation
- •Plot registration pending: 122 plots still unregistered out of 285
- •22 cleared plots need owner document submission and pay order completion
- •Government secondary school land adjustment for 1.5462 acres / 4.6855 bighas needs final legal/financial settlement if not completed
- •Government primary school has administrative approval, but construction/implementation may still need follow-up
Status Note
Land purchase, exchange and legal settlement, plot registration, and road, electricity, water, mosque, school and other infrastructure work are continuing.